Health and Human Services Commission (formerly MHMR)
Denton State School
|
Project Cost:
$1,900,000 |
| Victor Moore, Director of Construction
Services |
(512) 206-5893 |
As
part of the Texas LoanSTAR Program, Kinsman and Associates
was selected to produce an Energy Assessment Report on
the Denton campus. Following this assessment, TxMHMR contracted
with our firm to design, specify, and monitor the renovation
construction of lighting, heating, cooling, and a campus-wide
facility control system. Fifty-three buildings were converted
to more efficient types of lighting (e.g., T8 fluorescent
lamps and electronics ballasts). Thirty-six of these buildings
received energy management system (EMS) controls that
are interconnected with a fiber optics/Ethernet pathway.
A large steam boiler was removed and replaced with four
staged hot water boilers. Many rooftop packaged units,
fan coils, and single boilers were also replaced throughout
the campus.
|
| |