|
| Baylor Medical Center, Garland
|
Project Cost:
$1,000,000 |
| Ron Bowen, Director of Engineering
Services |
(972) 487-5377 |
As energy consultants to this medical center, our engineers
have designed and implemented several retrofit projects
to contain energy costs and electrical demand during a
period of substantial growth in building construction
and patient care. These projects included major lighting
conversions and improvements, replacement of steam traps,
installation of booster cooling coils and a deaerator
tank, replacement of steam boilers with high efficiency
fire-tube boilers, installation of a standby chiller for
critical areas by normal electrical service or emergency
generator, and implementation of a computer controlled
energy management system (EMS).
|
| |